Assignment
Question 1: 10 Marks
Identify from the given situations, which one is project and which one is a process? Identify each with one line
solid reason. (0.5 + 0.5 =1 Mark Each)
1. Designing a map for new office building.
2. Constructing a new office building.
3. Changing the oil of a vehicle.
4. Conducting polling for Election.
5. Developing Core i5 computer based system.
6. Loading of Luggage in a vehicle.
7. Payroll calculation of staff members.
8. Deploying a traffic plan system.
9. Teaching particular subject to a class.
10. Civil services competitive examination 2013.
Question no 2: 10 Marks
Suppose you are required to develop a Hospital Management System for providing different online services to the
patient attenders and the staff, which is considered as the complex system as along with patient record, medicinal
record is also kept, which keeps on changing with the demanding requirement of the health sector. You being a
Software Project Manager facing different requirements changing time to time by the management of the
hospital. You are leading a team of software engineers and you need to choose the process model first for having
an effective design model before proceeding to coding phase. Which process model you choose and why you
choose the selected process model? State with any four solid reasons.
2 + (2*4= 8) = 10 Marks
NOTE: Submit “.doc” file only. Every student should provide his/her own work, exact copying of the
assignment (or some portion of the assignment) from the internet or other students will lead to copy case and zero
marks will be awarded. Different softwares will be used to check plagiarism in assignments. Do not put any
query on MDB about this assignment, if you have any query then email at CS615@vu.edu.pk
Deadline:
Your assignment must be uploaded/submitted on or before 3nd May 2013.
Question 1: 10 Marks
Identify from the given situations, which one is project and which one is a process? Identify each with one line
solid reason. (0.5 + 0.5 =1 Mark Each)
1. Designing a map for new office building.
2. Constructing a new office building.
3. Changing the oil of a vehicle.
4. Conducting polling for Election.
5. Developing Core i5 computer based system.
6. Loading of Luggage in a vehicle.
7. Payroll calculation of staff members.
8. Deploying a traffic plan system.
9. Teaching particular subject to a class.
10. Civil services competitive examination 2013.
Question no 2: 10 Marks
Suppose you are required to develop a Hospital Management System for providing different online services to the
patient attenders and the staff, which is considered as the complex system as along with patient record, medicinal
record is also kept, which keeps on changing with the demanding requirement of the health sector. You being a
Software Project Manager facing different requirements changing time to time by the management of the
hospital. You are leading a team of software engineers and you need to choose the process model first for having
an effective design model before proceeding to coding phase. Which process model you choose and why you
choose the selected process model? State with any four solid reasons.
2 + (2*4= 8) = 10 Marks
NOTE: Submit “.doc” file only. Every student should provide his/her own work, exact copying of the
assignment (or some portion of the assignment) from the internet or other students will lead to copy case and zero
marks will be awarded. Different softwares will be used to check plagiarism in assignments. Do not put any
query on MDB about this assignment, if you have any query then email at CS615@vu.edu.pk
Deadline:
Your assignment must be uploaded/submitted on or before 3nd May 2013.