Posted by : Anonymous Tuesday, 8 January 2013


SEMESTER FALL 2012
CRISIS MANAGEMENT (MGMT629)
ASSIGNMENT NO. 02
DUE DATE: 7
TH
JANUARY 2013
MARKS: 15
ASSIGNMENT:
Objective of the activity:
The prime objective of this activity is to make the students understand about causes of
crisis; critical reasoning and impact of industrial crisis on country.
Learning outcome:
After this activity students will be able to:
a) Comprehend the concepts of causes of crisis
b) Gain knowledge about industrial crisis in Pakistan
Scenario
Pakistan is 10
th
largest country in terms of available human capital in the world. About
20.1% of labor force is involved in industrial development. Beta Corporation was a
garment factory located in Karachi that dealt with export of garments to Europe and the
United States. Almost 1,200 to 1,500 workers employed there, were earning between
5,000 to 10,000 rupees per month. On 2007, Securitycheck revealed deficiencies in fire
protection of the Karachi plant. On September 2012, Beta Corporation' factory caught
fire when a boiler exploded. Almost 300 to 400 workers were inside the factory when the
fire erupted. All the exit doors in the factory were locked and many of the windows of the
factory were covered with iron bars, which made it difficult for workers to escape and
consequently almost 289 people lost their lives and many of the deaths were caused by
suffocation. Mr. ABC, owner of the factory, claimed that company had implemented all
safety measures and the fire first broke out in the warehouse. He, himself, called the fire
brigade, which arrived about half an hour late. There was shortage of water supply in
Karachi at that time, resulting to make this crisis more horrible. Most renowned
personalities of the world condemned this incident and demanded fair investigation to
find out the actual culprits of this crisis.
Suppose, Govt. formed a committee to find out the causes of that crisis and appointed
you as the head of committee for answering the following questions;
1. Every crisis has certain critical determinants for its happening. Considering
above scenario, you are required to enlist factors that lead this crisis from a mild
happening to a disaster. (Marks = 4*2=8)
2. What measures you will suggest for preventing such kind of industrial crisis in
near future? (Marks = 7)
IMPORTANT:
24 hours extra / grace period after the due date is usually available to overcome
uploading difficulties. This extra time should only be used to meet the
emergencies and above mentioned due dates should always be treated as final
to avoid any inconvenience.
IMPORTANT INSTRUCTIONS/SOLUTION GUIDELINES/SPECIAL
INSTRUCTIONS
  The solution should be precise and to the point.
  In 1
st
question, only 4 relevant points should be discussed
  In 2
nd
question, maximum 5 measures should be discussed
OTHER IMPORTANT INSTRUCTIONS:
DEADLINE:
  Make sure to upload the solution file before the due date on VULMS.
  Any submission made via email after the due date will not be accepted.
FORMATTING GUIDELINES:
  Use the font style “Times New Roman” or “Arial” and font size “12”.
  It is advised to compose your document in MS-Word format.
  You may also compose your assignment in Open Office format.
  Use black and blue font colors only.
REFERENCING GUIDELINES:
  Use APA style for referencing and citation. For guidance search “APA
reference style” in Google and  read various website containing
information for better understanding or visit
http://linguistics.byu.edu/faculty/henrichsenl/apa/APA01.html
RULES FOR MARKING
Please note that your assignment will not be graded or graded as Zero (0), if:
  It is submitted after the due date.
  The file you uploaded does not open or is corrupt.
  It is in any format other than MS-Word or Open Office; e.g. Excel,
PowerPoint, PDF etc.
  It is cheated or copied from other students, internet, books, journals etc.





Note related to load shedding: Please be proactive
Dear students!
As you know that Post Mid‐Term semester activities have been
started  and  load  shedding  problem  is  also  prevailing  in  our
country now a days. Keeping in view the fact, you all are advised
to post your activities as early as possible without waiting for the
due  date.  For  your  convenience;  activity  schedule  has  already
been uploaded on VULMS for the current semester, therefore no
excuse will be entertained after due date of assignments, quizzes
or GDBs.

Leave a Reply

Subscribe to Posts | Subscribe to Comments

- Copyright © virtual university of pakistan - Skyblue - Powered by Blogger - Designed by Johanes Djogan -